Monthly Archives: February 2012

Return of the Crapper

This Sunday I will be returning to my land to admire any progress that was made. There should be a concrete strip road across the stream crossing. The filling in between and beside the concrete strip road down the access … Continue reading

Posted in Construction | Leave a comment

Work on the Stream Crossing Begins

The crossing point is about 20 or 25m upstream from the weir, which I’m standing on as I take the photo to the left. A number of boards in the weir are used to adjust the level of the water. … Continue reading

Posted in Construction | Leave a comment